Header information
Black Duck displays information in the header about the project version (such as the phase) along with the status of scans and the BOM.
Scans provides the status of the scans being processed for this BOM. Once the scan completes successfully, an status appears. Select the link to view the Scans tab of the Project Name Version Name Settings tab. Use this page to manage the scans for this project version.
Status provides the current status of the BOM. It has these possible values:
-
. The Black Duck system is processing events to create or update the BOM.
-
. The BOM is up-to-date; there are no errors.
-
. An error has occurred while processing an event or the Black Duck system is currently not processing any events and is up-to-date, however an error has occurred.
For and statuses, select the link to open the BOM Processing Status dialog box.
This dialog box lists each event, who submitted it, including the date and time, the time the event started, elapsed time, and current status.
Use this dialog box to see which events are pending or taking a long time to complete. If errors occurred during processing, the BOM Processing Status dialog box notifies you as to which event failed.
Click > located next to failed events to view the error message. Click to dismiss individual errors or dismiss all errors.
If left open, the dialog box updates the information shown in the table every 30 seconds, otherwise close and reopen the BOM Processing Status dialog box for a fresh update on the status of events.
Refer to the installation guide for information on configuring the frequency of the BOM event cleanup job (VersionBomEventCleanupJob) which clears BOM events that might be stuck because of processing errors or topology changes.